Zhenhua No. 23, loaded with 6 RMGs, left Nantong Subsidiary to South Korea Inchon Terminal on the early morning of Aug. 6th. The user of South Korea Inchon Terminal purchased the similar type of the equipment from ZPMC this time, after the cooperation with the Company in 2018.
It took 11 months from manufacturing to shipping these 6 automatic RMGs to South Korea Inchon Terminal. The supervisor of South Korea failed to arrive at the manufacturing site for inspection due to the outbreak of the Covid-19. The plum rains also added to the difficulty of loading these RMGs. However, the Project Department promoted the manufacturing with different flexible measures on the actual conditions to make sure the required quality and quantity. The Company also shipped the equipment as scheduled, winning the high recognition of the user and the supervisor.