The
ceremony of Haiwen (Puqian) Bridge in Hainan Province was held at 9 a.m. of
March 18th, which was open to the traffic officially at 3 p.m. of
the same day. ZPMC manufactured 41 steel box girders for main bridge and 20
steel box girders for approach bridge, including ones for the approach bridge
over the seismic fault and main bridge crossing the sea.
The Bridge
is the one-tower dual-cable steel box girder cable-stayed bridge with largest
investment, highest tower and largest span in the history of Hainan Province,
which is also the only sea-crossing bridge over the seismic fault with highest
earthquake and wind resistance levels in China. Haiwen Bridge, as one of key
traffic project of one bridge and six roads in the Province, is an important
traffic hub for the integrated economic circle of Haikou, Chengmai and
Wenchang. The Bridge can reduce the distance from Haikou to Wenchang greatly
after opening to the traffic, providing strong traffic support for the
integrated development of the economic circle as well as the whole island and
the whole province.