Equipment Transported to Jeddah, Saudi Arabia
time:2022/06/13 00:00:00

On May 24, Zhenhua 25 carrying four quay cranes for a Jeddah-based project in Saudi Arabia set off from Changxing Branch, alongside other six frontal cranes and three stacking machines destined for Saudi Arabia.

The Jeddah-based project in Saudi Arabia consists of ten quay cranes, four of which are transported this time in the first batch. The quay cranes of this project have a front reach of 74 meters, a rear reach of 23 meters, a gauge of 35 meters, a lifting height of 56 meters, and a rated under-dual-slings capacity of 80 metric tons.