Success delivery of Bethesda Bridge in Norway
time:2018/12/07 00:00:00

The section of Bethesda Bridge of Norway was shipped on TRINA Freighter from the terminal of ZPMC Nantong Branch to Port of Malm Norway on November 30th, which would be delivered after 30 days voyage.

Bethesda Bridge is 580m long totally, with the section of variable opening steel girder beam of 2.5m to 5m in the height and 5.5m to 16.5m in the width. ZPMC manufactured the steel structures of 2,864t for 12 spans of the total bridge.

The Bridge is constructed in accordance with EU standards with high quality requirements, which is the second project of the Company in Norway steel bridge market after building Hardanger Bridge in Norway more than 10 years ago.