1. Advanced technology, reasonable process. Thanks to the
2. There may be a single piece of Heavy Dock bearing 5,400 tons , as well as 7 Crane Assembly Dock, the total length is 2390 meters. More than 100 Quayside Machine can be placed for installation and commissioning and transported to the users’ docks, which can be put into production with the electrical connection.
3. We have 10,200 square meters of Heavy Plant, within 8 400t Heavy Traffic. The net height of workshop is 28 meters , and the ground bearing capacity is up to 2000t.
4. We have a fleet of 26 transportation ships which are 60,000DWT can delivery products to all over the world in the use of waterfront.
5. Can undertake various kinds of Steel-based Manufacture and the installation and transportation of Heavy Equipment, such as Large shield, Heavy-duty Goliath Cranes for Shipyards, Drilling Platform, Jacket, Engineering Vessels and Large Floating Cranes, Offshore Wind Power Towers, etc. .
6. ZPMC has the High-capacity Processing Equipment for the production of Steel Components. There are 120 mm Thick Steel Plate Rolling Machine, 1,800 tons Bending Machine, Automatic Submerged Arc Welding Machine, Heavy Plate Rolling Flat Machines, CNC Underwater Plasma Cutting Machine, Milling Machine, CNC Drilling, etc., and the 160 to 250 t Hydraulic Flatbed for the transportation of Special Reorganization Items.

Paint Aging Machine,